Projects previously completed include a variety of underground mine projects, such as complete backfill system installations, modern pumping systems, difficult steel liner installations for ventilation, escape and ore pass requirements as well as complete mine power and control systems. Our manufacturing facility also manufactures a variety of electrical enclosures, mine power centers, and various electrical apparatus.
Our machine and fabrication facilities have completed projects such as raise liner fabrication, extensive frame repairs on heavy mobile mine equipment, precision part repairs, and custom built parts and equipment.
- Barrick Goldstrike Inc.
Rodeo Mine
Elko, NV.
Fabrication & Installation of steel ore pass. 3/4" x 70" x 208' - AR 400 Wear Liner
Inclination angle of 82 degrees.
Nigel Bain - Mine Manager
Completed May 2008
- Barrick Goldstrike Inc.
Rodeo Mine
Elko, NV.
Fabrication & Installation of steel ore pass. 3/4" x 70" x 224' - AR 400 Wear Liner
Inclination angle of 82 degrees
Lee McCombs - Underground area Manager
Completed Oct. 2007
- Queenstake Mining Company
Smith Mine
Elko, NV 89801
Fabrication & Installation of steel ventilation raise liner - 3/8" x 72" x 540'
Inclination angle of 90 degrees
Robert Todd - Mine Manager
Completed Oct. 2007
- Newmont Mining Company
Leeville Mine
Elko, NV 89801
Installation of 4675 Level Ventilation & escape raise liner ( steel ) 3/8" x 8-1/2' x 230'
Frank Cox - Mine Engineer
Completed 2006
- Anglo Gold Company - SMD Subcontract
Lee Smith Mine
Elko, Nv. 89801
176 Ft. underground escape raise
Complete fabrication and installation of rolled 38" steel liners with ladders & landings
Lou Myers - Project Superintendent - SMD
Mark O'dell - Senior Mine Engineer, Anglo Gold Co.
- Anglo Gold Company - SMD Subcontract
Lee Smith Mine
Elko, Nv. 89801
Underground Anfo Platform and bins installation
Lou Myers - Project Superintendent - SMD
Matt Kendall - Project Engineer, Anglo Gold Co.
- Newmont Mining Company
Deep Post Mine
Underground Borehole Power Feeder Installation - Twin 500 mcm Feeders - 1,500' ea.
John Braaten - Foreman - Newmont Mining Co.
Chip Todd - Principal Engineer - Newmont Mining Co.
- Newmont Gold Company
Deep Post Mine Project - Presently ongoing
Underground Backfill plant construction
Underground Substation construction
Underground shop construction
Carlin, Nv. 89822
Mr. Robert Todd - Project Engineer
- Newmont Gold Company
Deep Post Mine Project
Preliminary site construction
Carlin, Nv. 89822
Mr. Glen Lewis - Senior Engineering Manager
- Newmont Gold Company
Deep Post Mine Project
Substation and distribution system design
Carlin, Nv. 89822
Mr. John Braaten - Underground Electrical Superintenden
- Newmont Gold Company
Deep Post Mine Project
13.8 kV Substation, 5 mVA
Carlin, Nv. 89822
Mr. Glen Lewis - Senior Engineering Manager
- Newmont Gold Company
Post Project - 120 kV 30 Mva Substation
Carlin, Nv. 89822
Mr. Jay Hutchison - Project Electrical Engineer
- Meikle Mine - General Services work
Ongoing crew for general mine electrical services
Barrick Goldstrike Mining Co.
Elko, Nv.
Mr. Loren Roberts - Mining Engineer
- Meikle Mine - Underground backfill Plant Installation - Mechanical & Electrical Systems
Install Besser style backfill system
Design & install electrical control system
Barrick Goldstrike Mining Co.
Elko, Nv.
Mr. Ralph Sacrison - Mining Engineer
Mr. Loren Roberts - Mining Engineer
- Deep Star Mine - Underground Mine Dewatering System
Design pumping system and oversee installation
Design backfill system electrical system
Newmont Gold Company
Carlin, Nv.
Mr. Doug Jones - Mine Manager
- Montanore Project - Mine Dewatering System & Mine Maintenance
a. Dirty Water Mine Dewatering System Design and Installation
b. Feasibility Work, 20,000 Ton Per Day Mine Electrical System
c. State Application work for 230 kV Powerline
d. Mine Maintenance Contract - Bolting and mine maintenance crews for 14,000 Ft. adit
Noranda Minerals Corporation
Libby, Montana
Joe Scheuering, New Projects Manager
Chip Todd, Project Engineer
- Castlegate Coal - Mine Hoist Retrofit
Automated Hoisting Installation Retrofit, Shaft, and Hoist System
Contractor:
Centennial Mining Corporation
Salt Lake City, Utah
Dave Bovee
- Christmas Mine - Hoist Removal
2 each, 750 HP and 1,500 HP
Christmas Mine
Globe, Arizona
Contractor:
Dynatec Mining Corporation
Lakewood, Colorado
Al Walsh, President
John Marrington, Vice President
- New Jersey Zinc. - Hoist Removal
2 @ 1,000 HP each
Contractor:
J.S. Redpath Corporation
Chandler, Arizona
Scott McIntosh, Vice President
- Conoco - Double Drum Hoist Removal (Electrical)
Crown Point New Mexico.
Contractor:
J.S. Redpath Corporation
Chandler, Arizona
Scott McIntosh, Vice President
- Carr Fork - Switchstation Rebuild and Retrofit
Anaconda Mining
Tooele, Utah
Irwin Sass
- ARCO Coal - Coal Handling Facility
Paonia, Colorado
Irwin Sass
- Dynatec Mining Corporation - RBM-7 Raisebore Rebuild - 2 each
Lakewood, Colorado
Al Walsh, President
John Marrington, Vice President
- Central Cambria Drilling Company - Dresser 900 Raisebore Rebuild
Pennsylvania
Glen Williamson
- Cooley Gravel - Gravel Quarry Conveyor and Crusher Electrical Design
Morrison, Colorado
Rick Mergens, Project Manager
- AJ Mine 15 kv Distribution System - Design and Procurement
Echobay Mining Corporation
Juneau, Alaska
Greg Sparks
Contractor:
Dynatec Mining Corporation
Lakewood, Colorado
Al Walsh, President
John Marrington, Vice President
- American Barrick Decline - Electrical System Installation & Design
American Barrick Gold Corporation
Elko, Nevada
- Arkansas Loop Project - PLC Programming
Western Gas Supply of Colorado
Durango, Colorado
Mel Lyons, Manager of Engineering
Denver Office
- Cobe Laboratories -
ETO and Gamma Ray Sterilization Facilities
PLC Programming
Lakewood, Colorado
John Seulean, Sterilization Manager
- Star Phoenix Mining Corporation - 3,000 HP Pump System Study
Wallace, Idaho
Contractor:
Dynatec Mining Corporation
Lakewood, Colorado
Ernie Kettner, Manager of Engineering
- Battle Mountain Gold - Pump Station Installation
San Luis, Colorado
Contractor:
CoNel Incorporated
Sterling, Colorado
- Wyoming Propane Projects - Site Electrical Installations (6 each)
Lawson-Savage Construction
Sheridan, Wyoming
Alton Coulter
Project Management:
Total Services Company
Bob Johnson
Parker, Colorado
- Glenwood Springs Distribution System Renovation
Glenwood Springs, Colorado
Engineering Company:
Electrical Systems Consultants
Jim Siano, President
- Empire Electric - 115 kv Switchyard Construction
Cortez, Colorado
Neal Stevens, Area Manager
- Natural Gas Pipeline Corporation of America (NGPL) - 22,000 HP Natural Gas Compressor Station
General Contractor:
Flint Constructors
Evanston, Wyoming
Mike Hardebeck
- Ropes Mine - Double Drum Mine Hoist Removal & Installation startup
Ispheming, MI
Contractor:
Dynatec Mining Corporation
Lakewood, Colorado
Al Walsh, President
- Blackbird Mine - 69 kV Substation and Line Rebuild,
Noranda Mining Inc.
Missoula, Mt.
Joe Scheuering
- Hydrocarbon Resources - Hoist Installation and mine electrical installation
Doc McNeely - Mine Manager
Vernal, Utah
- Shafter Texas, Single Drum Hoist Installation & Design
Goldfields, Mining Co.
Andy Katzmarak - Mine Engineer
Note: This listing is partial only, and does not intend to list all of the projects completed or presently underway by DEA Incorporated. This list is intended only to present an overview of the general types of projects completed by DEA Incorporated and is for reference purposes only.
|